What You Need to Know About Geotechnical Drilling
The success of an engineering plan relies on different factors and one of them is geotechnical drilling. This is important especially when considering new building and structure construction. It is geotechnical drilling that is being done due to many different reasons. Keep on reading this article and find out what these reasons are.
One of the reasons why this process is being done is to examine a new building site. It is this one that is required by law. Determining if the site is suitable for the new construction is what this one is able to do. It is the exerts that will determine if the soil is safe to build on once a geotechnical investigation is being done. Whenever this is being done then it is also the experts that will determine if there are any large rocks that can cause collapse to the structure. Before any permits will be given for the construction, it is this one that should first be done.
Another reason why geotechnical drilling is needed so that the building of foundation can be facilitated. The foundation that is made will be better than the conventional piling. Once you are able to utilize geotechnical drilling then it is the one where you can get soil samples. The best foundational support is what the experts will be able to come up once they will be doing this one. With the help of this one then the foundation that they will be building will be able to support the structure soundly. With geotechnical drilling, it is the foundation construction industry that has improved a lot. Providing the best results are what this enables the industry to do. This is beneficial especially when constructing piers, tall buildings, bridges, and levees.
Geotechnical drilling is also being utilized to be able to distinguish and aid in the remediation of tainted soil. It is the living organisms and people that will be in danger once there is contaminated soil and water. This is the reason why possible leakage is detected. This contamination can be caused by fuel tanks or waste. Drilling is being done usually when the site change owners.
There are three different stages when it comes to the detection of contamination. Assessment and looking for any signs of contamination is what phase one will include. The history of the site will be looked into when this is being done. An on-site investigation will also be done by a trained environmental consultant. If signs of contamination are seen then phase two will commence. The experts will drill, sample, test and monitor groundwater once this starts. It is remediation that is done during phase three.